
Partitioning co-ordination
Acoustic and privacy solutions integrated with joinery layouts. Typical for Melbourne office fitout projects.
Office Fitout · Melbourne
SteepWood delivers office fit-out in Melbourne VIC. Every office fit-out project for Melbourne clients is drawn, manufactured and installed by our team — operating since 2014 as Pavit Cabinetry Pty Ltd (NSW Carpentry Contractor Licence 489553C).
Get a Free Design Consultation
Our Melbourne office fit-out projects include office fitouts, commercial office joinery, workplace fit-outs and corporate fit-outs. Each Melbourne installation uses Polytec, Laminex, Caesarstone, Smartstone, Blum and Häfele components. Drawings, measure and quote are fixed before manufacture begins.


Acoustic and privacy solutions integrated with joinery layouts. Typical for Melbourne office fitout projects.

Floor-to-ceiling storage and filing systems for agile workplaces. Typical for Melbourne office fitout projects.

Fixed-price contracts, programmes, and single point of contact. Typical for Melbourne office fitout projects.

Brand-defining reception joinery designed for daily client-facing use. Typical for Melbourne office fitout projects.
For Melbourne office fit-out projects, material selection balances appearance, durability, and local conditions. We specify Polytec, Laminex, 2pac, stone benchtops, and Blum hardware on every Melbourne installation.
Office joinery from SteepWood is manufactured in our workshop and installed Australia-wide. Carcasses and casework use commercial-grade Laminex and Polytec panels, compact phenolic where high-cycle wear is expected, and solid surface or stone bench tops on reception desks and breakout zones. Hardware is Blum and Häfele throughout — drawer runners, hinges, and lift mechanisms rated for the cycle counts a busy office produces.
Commercial joinery fitout cost Australia varies more by inclusions than by size: a 200 sqm tenancy with a custom reception desk, two boardroom credenzas, a breakout kitchen, and four storage walls can land anywhere between $80,000 and $250,000 depending on finish level, freight to city, and programme compression. Capital-city tenancies typically sit at the higher end; projects near our workshop benefit from shorter lead times, faster site revisits, and no interstate freight loading on joinery.

office fit-out pricing in Melbourne ranges from $80,000 to $250,000 for a fully installed project, depending on size, materials and finish.

SteepWood delivers office fit-outs across Melbourne CBD, South Yarra, Toorak, Brighton, Carlton, Richmond, Hawthorn, St Kilda and surrounding Melbourne areas.
We programme office fit-outs in Melbourne from initial measure through install. Typical lead time: 12–16 weeks from deposit including freight and install scheduling. Free consultations are offered on qualifying Melbourne projects, with fixed-price quotes within five working days of measurement.
Install in Melbourne is completed by our own teams or vetted local partners. Every Melbourne project includes shop drawings, material schedules, and our 10-year structural joinery warranty.

Photographed from our workshop; designs are replicable to Melbourne homes and businesses.

Every project is designed and manufactured in our workshop using premium Laminex, Polytec, 2pac, stone, and Blum hardware.

We attend your Melbourne home or business for design consultations and site measures at no charge on qualifying projects.

Delivery and install co-ordinated from our workshop. Typical lead time: 12–16 weeks from deposit including freight and install scheduling.

3–4 weeks for design, landlord approvals, and fixed-price contract. For Melbourne projects, this step is scheduled within our 12–16 weeks from deposit including freight and install scheduling programme.

Manufacture in our workshop runs in parallel with site partitioning and services. Joinery lead time Australia workshop schedules are typically six to ten weeks for a mid-sized commercial fitout, and we lock dates against the builder's programme at shop-drawing sign-off — not at deposit. Weekly photos from the workshop floor keep the project manager and tenant in the loop. For Melbourne projects, this step is scheduled within our 12–16 weeks from deposit including freight and install scheduling programme.

Co-ordinated trades, defect period, and itemised depreciation schedule supplied. For Melbourne projects, this step is scheduled within our 12–16 weeks from deposit including freight and install scheduling programme.
Fixed-price quote within 5 working days. We respond to all enquiries within one business day.