How Long Does an Office Fitout Take? NSW Timeline Guide

Sukhveer Kaur · 25 September 2026 · 6 min read

How long does an office fitout take in NSW? Stage-by-stage timeline from lease to move-in, joinery lead times, approvals and how to avoid delays.

Office fitout timeline plan pinned beside joinery shop drawings in a NSW workshop — detail
Office fitout timeline plan pinned beside joinery shop drawings in a NSW workshop — context

The first question most businesses ask about a new office is cost. The second, and often more important, is time. How long does an office fitout take, and when do you need to start so staff can move in on the right day? This guide breaks down a realistic NSW office fitout timeline stage by stage, with the joinery lead times that often catch people out.

SteepWood manufactures office joinery in Newcastle for fitouts across Newcastle, the Central Coast and Sydney, so we see programs from the joinery side every week.

The short answer

Office sizeOn-site constructionDesign and approvals before site
Small (under about 300 m²)1–2 weeks6–10 weeks
Medium3–6 weeks6–10 weeks
Large6–16 weeksOften longer

In Sydney, SB Projects estimates 4 to 12 weeks on site plus 3 to 6 weeks of design, or 7 to 18 weeks in total. Vestra notes that the whole process from planning to move-in can run 6 to 12 months when it starts with a lease search.

Stage-by-stage timeline

StageTypical durationWhat happens
Brief and budget1–3 weeksHeadcount, rooms, style, budget
Site search and leaseVariesInspect, negotiate, sign
Concept and design3–6 weeksLayout, finishes, joinery concept
Landlord review2–4 weeksBuilding manager approves design
Approvals and certification3–4 weeksCouncil or certifier where required
Tender and pricing2–3 weeksBuilder and joiner quotes
Shop drawings and manufactureA few weeksJoinery built off site
Construction1–16 weeksPartitions, services, ceilings, flooring, install
Defects and commissioning1–2 weeksFix items, test services, clean
Move-inDaysIT, furniture, staff

Some stages overlap. The best programs run joinery manufacture at the same time as early site works.

Where joinery fits in the program

Joinery is often on the critical path because it is custom. Reception desks, kitchenettes and storage walls cannot be bought off the shelf at the last minute. The sequence is:

  1. Joinery design within the overall fitout design.
  2. Site measure once partitions are up, or from accurate drawings.
  3. Shop drawings for approval.
  4. Material ordering, including special laminates, veneers and hardware.
  5. Workshop manufacture.
  6. Delivery and install near the end of construction.
  7. Stone or solid surface tops templated and fitted.

Our post on joinery lead times explains how manufacture windows work in more detail.

STEEPWOOD OFFICE JOINERY — Shop drawings, workshop manufacture and install timed to your fitout program, for offices in Newcastle, the Central Coast and Sydney. Explore office fitout joinery or Get a free measure and quote.

The most common causes of delay

  • Changing the design after approval. Every change restarts parts of the process.
  • Slow landlord responses. Submit complete documents to avoid back-and-forth.
  • Long-lead materials. Special glass, imported finishes and some appliances.
  • Late IT and AV decisions. Joinery needs cable and equipment positions.
  • Base building surprises. Old services, asbestos or uneven slabs.
  • Holiday shutdowns. Suppliers and trades close over Christmas.

How to shorten your timeline

  1. Engage early. Bring designers and the joiner in during lease negotiation.
  2. Make decisions once. Lock in finishes, appliances and IT positions early.
  3. Choose available materials. Standard laminate ranges are faster than special orders.
  4. Run manufacture in parallel. Off-site joinery while partitions go up.
  5. Stage the work. If you must stay open, zone the fitout.
  6. Keep a single decision-maker. One person approving drawings saves days.

A warehouse office in Western Sydney has its own programme, which our warehouse office fitout guide walks through.

Regional differences

RegionProgram factor
NewcastleShort travel from our workshop; easier access in most buildings
Central CoastInstall blocks planned to suit travel; good availability of space
SydneyBuilding rules, dock bookings and after-hours work are common

Our Newcastle office fitout guide, Central Coast office fitout guide and Sydney office fitout joinery page cover each area.

A sample small-office program

For a 150 m² office with reception, kitchenette and storage, a realistic program from signed lease is often around three months: several weeks for design and landlord approval, a few weeks for shop drawings and manufacture alongside site works, a short construction period and a week for defects and move-in. Your own program will depend on the building, approvals and how quickly decisions are made.

SteepWood is Pavit Pty Ltd trading as SteepWood, ABN 52 697 313 269, NSW Carpentry Contractor Licence 489553C, with $20 million public liability. Our commercial joinery guide explains how we work with builders.

A checklist for the first month

If you have just decided to move or refit, these steps in the first four weeks set up the whole program.

  • Confirm headcount now and in two to three years.
  • List every room you need, including storage, print, kitchenette and quiet rooms.
  • Set a budget range and a target move-in date.
  • Ask the landlord for base building drawings and the fitout guide.
  • Book a measure with your designer and joiner.
  • Decide who signs off designs and variations.
  • Talk to your IT provider about data, Wi-Fi and AV needs.

Frequently asked questions

How long does an office fitout take?

On-site construction often takes 1 to 2 weeks for a small office, 3 to 6 weeks for a medium office and 6 to 16 weeks for a large fitout. Design and approvals commonly add 6 to 10 weeks beforehand. Planning from lease decision to move-in can take several months.

What causes office fitout delays?

Late design decisions, slow landlord approval, long-lead items such as special glass, stone or equipment, and changes after joinery is ordered are the most common causes. Base building issues found during demolition also add time.

How long does office joinery take to make?

Once shop drawings are approved and materials confirmed, office joinery is typically manufactured in a few weeks. Special laminates, veneers or stone can extend this, so check lead times at the design stage.

Can an office fitout happen while we keep working?

Yes, with staging. Work can be done in zones, after hours or over weekends. It takes longer and can cost more, but it avoids a full shutdown.

When should I start planning an office relocation?

Start well before your lease expires. Some guides suggest the full relocation process, from search to move-in, can run 6 to 12 months. Even a small fitout benefits from at least three months of planning.

Lock in your joinery window

Send us your floor plan and target move-in date. We will confirm a joinery manufacture window and the decisions we need from you to meet it. Get a free measure and quote or call 0468 387 676.

Office fitout timeline plan pinned beside joinery shop drawings in a NSW workshop — feature